Whatsapp
Home » Projects » Kemer Huzur Mosque, Antalya: Solving an Acoustic Problem
Kemer Huzur Mosque, Antalya: Solving an Acoustic Problem

Kemer Huzur Mosque, Antalya: Solving an Acoustic Problem

⏱ Tahmini okuma süresi: 3 dk

Construction of the Huzur Mosque in Kemer, Antalya, was completed in 2018 and the mosque opened for worship the same year. This article covers Acoustic Problem. From the start, however, acoustic problems caused by the architecture meant that the sound never met expectations. The mosque officials contacted us; a design based on our acoustic measurements was implemented, and the sound problem was fully solved.

Acoustic Problem: Project summary

  • Mosque: Huzur Mosque, Kemer / Antalya, Türkiye
  • Opened: 2018
  • Problem: acoustic problems caused by the architecture; sound below expectations since opening
  • Approach: acoustic measurement on site, design based on the results
  • Result: problem fully solved

Why can a new mosque have unintelligible sound?

Poor sound in a new mosque is usually about acoustics, not equipment quality. Domes, high ceilings, marble, stone, glass and plaster reflect sound. It keeps circulating in the hall; this is called reverberation. The longer it lasts, the more the words overlap, and the congregation says: “there is sound, but we cannot understand it.” Turning the volume up rarely helps, because louder sound also means stronger reflections.

How a measurement-based design works

  1. Survey and acoustic measurement: volume, floor area, dome structure, surfaces and the existing system are examined, and measurements show where the problem is concentrated.
  2. Speaker placement and aiming: the number, height and angle of the speakers are calculated to keep sound away from reflective surfaces and aim it at the congregation.
  3. Amplifier, mixer and microphones: amplifier power matched to the speaker lines, separate microphone channels for mihrab, minbar, kürsü and muezzin gallery.
  4. Installation, tuning and testing: levels, tone and delay are set so every part of the mosque hears balanced sound; handover follows approval by the staff and congregation.

Read more in our mosque sound system guide and about the ARP 150 mosque speaker, developed for mosques with difficult acoustics.

Photos

Frequently asked questions

What was the sound problem at Kemer Huzur Mosque?

Since it opened in 2018, acoustic problems caused by the architecture kept the sound quality below expectations.

How was it solved?

Acoustic measurements were taken, and a design based on the results was implemented. The problem was fully solved.

Can a newly built mosque have acoustic problems?

Yes. Domes, high ceilings, marble and glass can cause long reverberation in new mosques too. The sound system is best planned during construction.

Do you have a similar problem in your mosque? Contact us for a survey.

For questions about Acoustic Problem, feel free to contact us.

Powered by Digiboss
Get a QuoteWhatsApp